Flagstone - Mining Intelligence
AI-POWERED MINING INTELLIGENCE

AI-powered due diligence for mining technical reports.

Unlock the power of mining intelligence. Every technical report runs hundreds of pages behind a single number - Flagstone’s AI technology reads the report and tells you whether the work actually holds up, benchmarked against comparable projects and graded against what the study stage should deliver.

Automated due diligence for NI 43-101 technical reports.
01 - WHAT IT DOES
I.

Reads the report

Upload an NI 43-101. Flagstone detects the study stage and the processing method, and pulls the metallurgy, recovery, costs and resource basis.

II.

Benchmarks against peers

Every key figure is placed against the expected range for comparable projects - not a ranking, a position within what's normal for the stage.

III.

Grades the defensibility

It assesses whether the disclosed work supports the claims, and reads the metallurgy the way a reviewer would - then gives you one clear, reproducible grade, with the full reasoning shown.

02 - THE FIVE DIMENSIONS

Graded across the whole report.

Not one headline number. Flagstone grades five distinct dimensions, each against what a PEA, PFS or FS is expected to demonstrate at its stage.

QA/QC & data verificationIs the assay data well-controlled enough to trust?§11–12
Metallurgy & recoveryDoes the testwork support the recovery the economics assume?§13 · §17
Resource & reserveIs the estimate built and classified defensibly?§14–15
EconomicsAre the capex, opex and NPV built on defensible ground?§21–22
Environmental & permittingCan it get permitted, built and closed responsibly?§20

Each dimension is reported on its own - a strong economics section never hides a thin resource. You see every grade, and the evidence behind it.

03 - THE DIFFERENCE

Not just what the report says. Whether you can trust it.

Plenty of tools extract and compare the numbers in a report. Flagstone does something different - it asks whether the work behind those numbers actually supports them, judged against what a PEA, PFS or FS is each expected to demonstrate. The conclusion stays with you. Flagstone just gets you to it faster.

04 - COVERAGE

The whole of NI 43-101.

NI 43-101 is the code behind every project on the TSX and TSX-V. Flagstone reads all of it.

29Cu
CopperCuprum
Methods
Porphyry flotation Oxide / sulphide leach · SX-EW
Deposit & ore types
PorphyrySkarn OxideChalcocite (supergene) & more
79Au
GoldAurum
Methods
CIL / CIPHeap leach Flotation concentratePressure oxidation · POX
Deposit & ore types
Free-millingOxide Refractory sulphideDouble-refractory Carbonaceous & more
Across PEAPFSFeasibility
Preview a report →
05 - READING SOON

Beyond NI 43-101.

AUSTRALASIA
COMING SOON

JORC reports

Mineral resource and ore reserve reports under the JORC Code.

UNITED STATES
COMING SOON

S-K 1300 reports

Technical report summaries filed under SEC Regulation S-K 1300.

06 - SEE IT

See a Flagstone report

Three real technical reports, assessed across the study stages:

Each shows the benchmark position, the grades with full reasoning, and exactly how the final grade was reached. Nothing hidden.

07 - HOW IT WORKS

How it works

STEP 01 Upload your report
STEP 02 Flagstone reads, benchmarks and grades the work
STEP 03 Get your graded assessment in minutes

Pay per report. No account needed.

Assess a report →
08 - PRICING

Pricing, in the open.

Every plan runs the full five-dimension assessment, with every finding cited back to the report. Start per-report; move to a plan when your pipeline picks up.

Per report
$299 / report
No commitment.
  • -One full five-dimension assessment
  • -Every finding cited to the report
  • -Shareable rendered report
  • -Pay as you go
Most popular
Pro
$1,990 / mo
10 reports included · $199 each after.
  • -Everything in Per-report
  • -10 reports / month, then $199 each
  • -Report library & history
  • -Priority turnaround
Enterprise
Custom
High volume & integration.
  • -Everything in Pro
  • -Unlimited / high-volume
  • -API & white-label
  • -Team seats & dedicated support
5-report pack
Five reports.
A single pack of five at $199 each - the Pro per-report rate, without a monthly plan.
$995
$199 / report
09 - THE STORY

Hi! I'm Nico - a mining engineering student from Chile, working in metallurgy in Canada, and passionate about technology and making processes work better. I spend my days around different mining reports, and I kept thinking the same thing: there's no fast, honest way to tell whether the work behind a report actually holds up.

So I built one. Flagstone is that tool - made by someone who works in this world, for the people who have to trust these reports.

It's growing fast, and I'd genuinely love your feedback.